GR®532 : étape 2 de Lembach à Obersteinbach

Lembach
Medium
Club Vosgien
GR®
2. GR®532 : étape 2 de Lembach à Obersteinbach
6h
13,4km
+309m
-274m
Crossing
Embed this item to access it offline
1 point of interest

La galerie principale - SYCOPARC 
Lembach Lime kiln - Maginot line work
Strong built from 1930 to 1935 whose name comes from the locality on which it is, it was occupied from 1938 before being bombed in June 1940. The troops had to go and the fort was then occupied from 1940 to 1944 by the German army. After restoration, it was opened to the public in 1983. It consists of 6 blocks, each armed with a howitzer, a barrel, mortars, grenade launcher, twin machine guns and anti-tank guns. More info here.
Forecast
Altimetric profile
Information desks
2 route de Bitche, 67510 Lembach
Report a problem or an error
If you have found an error on this page or if you have noticed any problems during your hike, please report them to us here:




